Commercial EV charging infrastructure enables businesses, fleets, and property owners to provide convenient, reliable charging for electric vehicles.
SCF helps you integrate Level 2 and DC fast charging stations with flexible third-party financing and turnkey delivery—often paired with solar power for maximum sustainability and savings.
- No upfront capital required
- Revenue generation from charging sessions
- Predictable service and energy costs
- Turnkey design, permitting, and installation
- 24/7 monitoring and uptime management
- Support for ESG and clean transportation goals
- Trusted network and maintenance partners
- Seamless integration with solar + storage

EV chargers draw electricity from your building or a dedicated service line, delivering power to vehicles via networked stations that manage usage, billing, and access.
Systems can include Level 2 (AC) chargers for daily workplace charging or DC fast chargers for quick turnaround in retail and fleet applications.
With SCF’s integrated monitoring and management, usage data, uptime, and revenue are tracked automatically—ensuring reliable service and transparent reporting.

By offering EV charging, your property becomes a future-ready destination that attracts tenants, customers, and employees while supporting clean transportation goals.
Types of Commercial EV Charging Systems
SCF will assess the right EV charging solution for each unique situation and property to ensure the right fit for your goals.
Benefits of Commercial ev charging

Integration Opportunities
SCF models each scenario to maximize ROI and resilience, and ensure that the customer the solution best suited to their needs.
Every SCF project begins with a comprehensive evaluation to ensure technical feasibility and strong financial performance. Our team analyzes your site conditions, energy usage, and utility tariffs to design a system that meets your goals while maximizing long-term savings. Through advanced modeling and decades of experience, SCF delivers accurate forecasts of system output, cost reduction, and PPA pricing so you can move forward with complete confidence.

Frequently Asked Questions
How long does it take to install EV chargers?
Most commercial EV charging projects are completed within 3–6 months, depending on permitting, utility coordination, and equipment lead times.
What types of chargers does SCF offer?
SCF provides both Level 2 and DC fast chargers, selected based on your site layout, parking flow, and charging demand requirements.
Can EV chargers be powered by solar?
Yes. SCF can pair your charging stations with on-site solar and energy storage to reduce grid reliance and improve energy resilience.
Who handles maintenance and network management?
SCF oversees all operations, maintenance, and network uptime through your PPA, ensuring chargers stay connected and fully operational.
Can I charge users or employees for electricity?
Absolutely. SCF’s networked systems allow you to set rates, track usage, and manage access for public, fleet, or private charging scenarios.
What incentives are available for EV charging projects?
SCF identifies and applies available federal, state, and utility rebates or grants to lower costs and enhance the financial return of your project.

